Project Details:
Project consisted of a 35,000 sf—220
ft wide clearspan pre-engineered building
along with three (3) additional support PEMB's with insulated
ribbed
panels. The turbine building included panels
conforming to NRC and STC requirements. Also included were
louvers,
the mechanical and plumbing packages, interior
cranes, and office fitout.
|